9. CONNECT EXHAUST FRONT PIPE TO TAIL PIPE
(a) Connect the front pipe to the tail pipe, and torque the bolts.
Torque: 440 kg·cm (32 ft·lb, 43 N·m)
(b) Install the rubber hanger.
10. INSTALL PROPELLER SHAFT
(a) Align the matchmarks on the bolt flanges.
(b) Install and torque the bolts.
Torque:
Propeller shaft flange
750 kg·cm (54 ft·lb, 74 N·m)
Center support bracket
500 kg·cm (36 ft·lb, 49 N·m)
11. FILL WITH TRANSMISSION OIL
Oil grade: API GL-4 or GL-5
Viscosity:
W58 M/T SAE 75W-90 or 80W-90
R154 M/T SAE 75W-90
Capacity:
W58 M/T 2.4 liters (2.5 US qts, 2.1 Imp. qts)
R154 M/T 3.0 liters (3.2 US qts, 2.6 Imp. qts)
12. INSTALL SHIFT LEVER
13. INSTALL CENTER CLUSTER FINISH PANEL
14. INSTALL NEGATIVE BATTERY CABLE
15. PERFORM ROAD TEST
Check for any abnormal noise or operation.