
SR-72
STEERING — Power Steering (Gear Housing)
9. INSTALL CONTROL VALVE LOWER BEARING
10. INSTALL BEARING GUIDE NUT
(a) Apply sealant to 2 or 3 threads of the guide nut.
Sealant: Part No.08833-00080, THREE BOND 1344, LOCTITE 242 or equivalent
(b) Using SST, torque the bearing guide nut.
SST 09612-24014 (09612-10022)
Torque: 150 kg-cm (11 ft-lb, 15 N·m)
(c) Using SST and torque meter, loosen the bearing guide nut until the preload is within specification.
SST 09612-24014 (09612-10022), 09616-00010
Preload (turning): 4.5 — 6.5 kg-cm
(3.9 — 5.6 in.-lb, 0.4 — 0.6 N·m)
11. INSTALL BEARING GUIDE LOCK NUT
(a) Apply sealant to 2 or 3 threads of the lock nut.
Sealant: Part No.08833-00080, THREE BOND 1344, LOCTITE 242 or equivalent
(b) Using SST, install and torque the lock nut.
SST 09612-24014 (09612-10022, 09617-24020)
Torque: 570 kg-cm (41 ft-lb, 56 N·m)
HINT: Use a torque wrench with a fulcrum length of 340 mm (13.39 in.).
(c) Recheck the preload.
Preload (turning): 4.5 — 6.5 kg-cm
(3.9 — 5.6 in.-lb, 0.4 — 0.6 N·m)
12. INSTALL RACK GUIDE SEAT, RACK GUIDE AND RACK GUIDE SPRING
(a) Install the rack guide with the seat.
(b) Install the spring.