TSRM/MK4 Supra/Repair Manual
Repair ManualWiring Diagrams
p.125
ATR/ATM Unit Repair126 / 275
p.127
BASIC SUBASSSEMBLY REASSEMBLY — MK4 Supra ATM Unit Repair, page 126
100%
AT-89 A340E (2JZ-GTE) AUTOMATIC TRANSMISSION - COMPONENT PARTS INSTALLATION AT0PW-03 BASIC SUBASSSEMBLY REASSEMBLY 1. INSTALL TRANSMISSION CASE Install the transmission case in the overhaul attachment. AT5393 2. INSTALL BEARING AND RACE (a) Coat the assembled bearing and race with petroleum jelly. (b) Install it onto the case. Assembled bearing and race diameter mm (in.) Inside Outside Assembled bearing and race 39.0 (1.535) 57.7 (2.272) AT5155 AT5132 705228 3. INSTALL LEAF SPRING AT5107 4. INSTALL REAR PLANETARY GEAR UNIT WITH FIRST AND REVERSE BRAKE AND OUTPUT SHAFT (a) Install the flange, the rounded edge facing upward. (b) Install the 7 plates and 7 discs. Install in order: P=Plate D=Disc D-P-D-P-D-P-D-P-D-P-D-P-D-P Flange P D P D P D P D P D P D P D AT5229 705232 (c) Align the teeth of the flange, discs and plates. Y 004067