TSRM/MK4 Supra/Repair Manual
Repair ManualWiring Diagrams
p.059

SFTE/SFI System 2JZ-GTE — Knock Sensors Inspection, page 60

60 / 71
p.061
Knock Sensors Inspection — MK4 Supra SFI System 2JZ-GTE, page 60
100%
Page text (OCR transcript)
ENGINE – SFI SYSTEM (2JZ-GTE)

KNOCK SENSORS INSPECTION

1. REMOVE THROTTLE BODY
(See throttle body removal)
2. REMOVE STARTER
(See starter removal in Starting System)

SST

P12819

3. REMOVE KNOCK SENSORS
(a) Disconnect the knock sensor connector.
(b) Using SST, remove the knock sensor.
SST 09816–30010

Ohmmeter

P01630

4. INSPECT KNOCK SENSORS
Using an ohmmeter, check that there is no continuity between the terminal and body.
If there is continuity, replace the sensor.

SST

P12819

5. REINSTALL KNOCK SENSORS
(a) Using SST, install the knock sensor.
SST 09816–30010
Torque: 44 N·m (450 kgf·cm, 33 ft·lbf)
(b) Connect the knock sensor connector.
6. REINSTALL STARTER
(See starter installation in Starting System)
7. REINSTALL THROTTLE BODY
(See throttle body installation)