
21. CONNECT TAIL PIPE AND FRONT PIPE
(a) Connect the pipe to the tail pipe.
(b) Install the two rubber hangers.
(c) Install the pipe clamp to the transmission case.
Torque: 440 kg-cm (32 ft-lb, 43 N-m)
22. INSTALL INTERMEDIATE PROPELLER SHAFT
23. CONNECT WIRING CONNECTORS TO NEUTRAL START AND BACK-UP LIGHT SWITCHES
24. CONNECT TRANSMISSION THROTTLE CABLE
(a) Connect the cable to the throttle linkage.
(b) Connect the cable housing to the bracket.
25. ADJUST TRANSMISSION THROTTLE CABLE
26. CONNECT UPPER RADIATOR HOSE AND FILL WITH COOLANT
27. CONNECT BATTERY CABLE TO NEGATIVE (−) TERMINAL
0-1 mm (0-0.04 in.)