TSRM/MK2 Supra/Wiring Diagrams
Repair ManualWiring Diagrams
p.002

S28/Combination Meter — 28-2 Combination Meter (Digital), page 3

3 / 4
p.004
28-2 Combination Meter (Digital) — MK2 Supra Combination Meter wiring diagram, page 3
100%
Page text (OCR transcript)
28-2 COMBINATION METER (DIGITAL)

TO FUSE
BOX
2.5A
GAUGE

18(Z1)
Y

B(A)  S(A)

COMBINATION METER
1(B)

CHARGE  3  BRAKE  3  TAIL  3  FUEL  3  FUEL SCALE CHANGE

FUEL  TEMP.  TACH

SPEED SCALE CHANGE

SPEED INTERFACE

7(A)  8(A)  3(A)  2(B)  10(B)  5(B)  11(B)  7(B)  9(B)  8(B)

W-R  Y-R  BR  L-B  T  Y-L  Y-G  B  B

3(C4)  4(E2)  19(C2)  18(C2)  17(C2)  11(E1)  8(C1)

Y  Y  L-B  T  Y-L  B

8(Z1)  2(Z1)  1(C1)  14(P1)  6(P1)  15(P1)  8(Z0)

W-R  W-R  Y  BR  L-B  Y-L  Y-G  B

PARKING BRAKE S/W  DRIVE FLUID LEVEL S/W  OIL PRESSURE S/W  FUEL SENDER  WATER TEMP. SENDER  IGNITER

1  2  1  2  1  2  3  1  2  1  1(I)
START POSITION
START S/W (AT)

9(Z0)  14(Z1)  19(Z1)  EXCEPT FOR START POSITION

2(Z0)  11(Z0)

W-R  BR

UNDER
J/B NO.3  ECM
CONN.

- 74 -