
INSTALLATION OF WINDSHIELD
1. INSTALL DAM
(a) Apply double-stick tape at a point 7 mm (0.28 in.) from the glass rim.
(b) Place the dam on the double-stick tape.
HINT: Cut a V-wedge into the corner folds of the dam.
NOTICE: Do not touch the glass face after cleaning it.
2. COAT CONTACT SURFACE OF BODY WITH PRIMER "M"
Using a brush, coat the contact surface on the body with primer M.
NOTICE:
• Let the primer coating dry for 10 minutes or more. Make sure that the installation of the glass is finished within 2 hours.
• Use care not to leave any part of the contact surface uncoated or excessively coated, as Primer "M" and "G" serve to boost the adhesive power of the adhesive to the glass or body.
• Do not keep any of the opened primer M and G for later use.
3. COAT CONTACT SURFACE OF GLASS WITH PRIMER "G"
(a) Using a brush or sponge, coat the edge of the glass and contact surface with primer G.
(b) Before the primer dries, wipe any excess off with a clean cloth to avoid too thick a coat.
NOTICE: Be sure that installation of the glass is finished within 70 minutes.
4. MIX ADHESIVE COATING
NOTICE:
• Be sure that installation of the glass is finished within usable time.(See step 2 on page BO-31)
• Mixture should be made in 5 minutes or less.
(a) Thoroughly clean the glass plate and putty spatula with solvent.
(b) Using a putty spatula, thoroughly mix 500 g (17.64 oz.) of the main and 75 g (2.65 oz.) of the hardening agents on a glass plate or such.