MT-76
MANUAL TRANSMISSION — Assembly of Transmission
ASSEMBLY OF TRANSMISSION
(See pages MT-49, 50)
1. INSTALL OUTPUT SHAFT TO INTERMEDIATE PLATE
(a) Install the output shaft into the intermediate plate by pushing on the output shaft and tapping on the intermediate plate.
(b) Using snap ring pliers, install the snap ring.
2. INSTALL INPUT SHAFT
(a) Apply gear oil to the needle roller bearing and install it into the input shaft.
(b) Install the input shaft to the output shaft with the synchronizer ring slots aligned with the shifting keys.
3. INSTALL COUNTER GEAR
Install the counter gear to the intermediate plate while holding the counter gear, and install the counter rear bearing with a plastic hammer.
4. INSTALL REVERSE SHIFT ARM BRACKET
Install the reverse shift arm bracket and torque the bolts.
Torque: 185 kg-cm (13 ft·lb, 18 N·m)