
TURBOCHARGER SYSTEM — Turbocharger
TC-15
INSTALLATION OF TURBOCHARGER
(See page TC-9)
NOTICE: After installing the turbocharger assembly, pour approx. 20 cc (1.2 cu in.) of new oil into the oil inlet and turn the impeller wheel by hand to splash oil on the bearing.
1. INSTALL TURBINE OUTLET ELBOW
Install a new gasket and the turbine outlet elbow with the four nuts.
Torque: 440 kg·cm (32 ft·lb, 43 N·m)
2. INSTALL TURBO OIL PIPE
Install a new gasket and the turbo oil pipe with the two nuts.
Torque: 130 kg·cm (9 ft·lb, 13 N·m)
3. INSTALL NO.1 TURBO WATER PIPE
Install a new gasket and the No.1 turbo water pipe with the two nuts.
Torque: 75 kg·cm (65 in.·lb, 7.4 N·m)
4. INSTALL TURBOCHARGER
(a) Face the new gasket so the protrusion is facing the rear and install on the exhaust manifold.
(b) Place a new gasket on the oil return hole of the cylinder block.