TSRM/MK4 Supra/Repair Manual
Repair ManualWiring Diagrams
p.033
SFTE/SFI System 2JZ-GTE34 / 71
p.035
THROTTLE BODY REMOVAL — MK4 Supra SFI System 2JZ-GTE, page 34
100%
EG–291 ENGINE – SFI SYSTEM (2JZ-GTE) THROTTLE BODY REMOVAL Installation is in the reverse order of removal. 1. DRAIN ENGINE COOLANT 2. REMOVE THROTTLE BODY (a) Disconnect the hose, cables and connectors from the throttle body: (1) Air hose (2) Accelerator cable (3) Cruise control actuator cable (4) Throttle position sensor connector (5) Sub–throttle position sensor connector (6) Sub–throttle actuator connector (b) Remove the 2 bolts and 2 nuts, and disconnect the throttle body from the air intake chamber. Torque: 21 N·m (210 kgf·cm, 15 ft·lbf) (c) Remove the gasket. INSTALLATION HINT: Use a new gasket. (d) Disconnect these hoses from the throttle body, and remove the throttle body: (1) EVAP hose (2) Water bypass hose (from No.4 water bypass pipe) (3) Water bypass hose (from cylinder head) (4) PS air hose THROTTLE BODY INSPECTION Throttle Body 1. CLEAN THROTTLE BODY (a) Using a soft brush and carburetor cleaner, clean the cast parts. (b) Using compressed air, clean all the passages and apertures. NOTICE: To prevent deterioration, do not clean the throttle position sensors, actuator, dashpot and throttle opener. 2. INSPECT THROTTLE VALVE (a) Disconnect the throttle opener vacuum hose from the throttle body. (b) Apply vacuum to the throttle opener. (c) Check that there is no clearance between the throttle stop screw and throttle lever when the throttle valve is fully closed. (d) Reconnect the vacuum hose to the throttle body. Throttle Lever Vacuum No clearance Disconnect Throttle Stop Screw P11327 P11329 P11329 P11982 P11466