
6. INSTALL TORQUE CONVERTER IN TRANSMISSION
If the torque converter has been drained and washed, refill with fresh ATF.
ATF capacity: 2.0 liters (2.1 US qts, 1.8 Imp. qts)
Fluid type: ATF DEXRON® II
7. CHECK TORQUE CONVERTER INSTALLATION
Using calipers and a straight edge, measure from the installed surface to the front surface of the transmission housing.
Correct distance: 26 mm (1.02 in.)
8. INSTALL GUIDE PIN IN TORQUE CONVERTER
9. ALIGN TRANSMISSION AT INSTALLATION POSITION
CAUTION: Be careful not to tilt the transmission forward because the torque converter could slide out.
(a) Align the guide pin with one of the drive plate holes.
(b) Align two sleeves on the block with the converter housing.
(c) Temporarily install one bolt.
10. INSTALL TRANSMISSION HOUSING MOUNTING BOLTS
(a) Install the starter.
(b) Install the four transmission housing mounting bolts.
Torque: 650 kg-cm (47 ft-lb, 64 N·m)
11. INSTALL SIX TORQUE CONVERTER BOLTS
(a) Remove the guide pin.
(b) Install the six bolts finger tight. Turn the crankshaft to gain access.
(c) Tighten the bolts evenly.
Torque: 280 kg-cm (20 ft-lb, 27 N·m)
12. INSTALL ENGINE UNDER COVER