
WINDSHIELD
TOOLS AND SUPPLIES
Part Name and Part No. | Content of Set | Quantity
Adhesive set
08850-00070 | Main agent 500 g (17.64 oz.) | 1 can
[0 - 15°C (32 - 59°F)] | Hardening agent 75 g (2.65 oz.) | 1 ea.
| Primer G (for glass) 20 g (0.71 oz.) | 1 ea.
08850-00080 | Primer M (for body) 20 g (0.71 oz.) | 1 ea.
[15 - 35°C (59 - 95°F)] | Sponge for applying primer | 2 ea.
08850-00090 | Piano wire 0.6 mm dia. x 1 m (0.024 in. dia. x 39.37 in.) | 1 ea.
[36 - 45°C (95 - 113°F)] | Cartridge | 1 ea.
Dam kit
04562-14010 | Dam | 1 set
| Double-stick tape (for sticking on dam)
| Sealant gun (for applying adhesive)
| Glass or steel sheet (for mixing adhesive)
| Putty spatula (for mixing adhesive and correcting adhered parts)
| Solvent (Alcohol, lead-free gasoline — for cleaning adhering surfaces)
Ambient
temperature | Part No. | Part name
0 - 15°C
(32 - 59°F) | 08850-00070 | Windshield glass
adhesive set
No. 15
15 - 35°C
(59 - 95°F) | 08850-00080 | Windshield glass
adhesive set
No. 35
36 - 45°C
(95 - 113°F) | 08850-00090 | Windshield glass
adhesive set
No. 45
1. CHOOSE AN ADHESIVE SET
Use a proper adhesive set depending upon the ambient
temperature.
2. CHECK ADHESIVE USABLE TIME
After mixing the main and hardening agents, finish glass
installation within the specified time as shown.
Example:
For glass installation in ambient temperature of 25°C
(77°F), apply adhesive set No. 35 within 45 minutes.
3. CHECK ADHESIVE HARDENING TIME
When the main and hardening agents are mixed, leak tests
should be made only after the hardening time has elapsed.
Example:
Hardening time for adhesive set No. 35 with ambient
temperature of 25°C (77°F) is 150 minutes.
CAUTION: Do not drive the vehicle until at least double
the hardening time has elapsed.