
AT-107
A340E (2JZ-GTE) AUTOMATIC TRANSMISSION - COMPONENT PARTS INSTALLATION
39. REMOVE TRANSMISSION CASE FROM OVERHAUL
ATTACHMENT
40. INSTALL TRANSMISSION HOUSING
(a) Clean the threads of the bolts and case with white gaso-
line.
(b) Apply seal packing or equivalent to the 6 bolts.
Seal packing:
Part No.08833-00070, THREE BOND 1324 or equiva-
lent
(c) Install and torque the 6 bolts.
Torque:
14 mm bolt: 34 N·m (345 kgf·cm, 25 ft·lbf)
17 mm bolt: 57 N·m (580 kgf·cm, 42 ft·lbf)
Y 003895
41. INSTALL O/D DIRECT CLUTCH SPEED SENSOR
(a) Coat a new O-ring with ATF and install it to the speed sen-
sor.
(b) Install the speed sensor.
(c) Install and torque the bolts.
Torque: 5.4 N·m (55 kgf·cm, 48 in.·lbf)
Y 003894
42. INSTALL NO.2 VEHICLE SPEED SENSOR
(a) Coat a new O-ring with ATF and install it to the speed sen-
sor.
(b) Install the speed sensor.
(c) Install and torque the bolts.
Torque: 5.4 N·m (55 kgf·cm, 48 in.·lbf)
Y 003895
43. INSTALL NO.1 VEHICLE SPEED SENSOR
(a) Coat a new O-ring with ATF and install it to the No.1 ve-
hicle speed sensor.
(b) Install the No.1 vehicle speed sensor.
(c) Install and torque the bolt.
Torque: 16 N·m (160 kgf·cm, 12 ft·lbf)
Y 003893