
ENGINE – TURBOCHARGER SYSTEM (2JZ–GTE)
PRESSURE TANK INSPECTION
1. REMOVE PRESSURE TANK
2. INSPECT PRESSURE TANK
(a) Check that air flows from port A to B.
Air
A B
P12057
(b) Check that air does not flow from port B to A.
Air
A B
P12055
(c) Apply 60.0 kPa (450 mmHg, 17.72 in.Hg) of vacuum to port A, and check that there is no change in vacuum after 1 minute.
If operation is not as specified, replace the pressure tank.
Vacuum
A B
P12056
3. REINSTALL PRESSURE TANK