1. INSPECT SHIFT LOCK CONTROL ECU
Using a voltmeter, measure the voltage at each terminal.
Connector | Terminal | Measuring condition | Voltage (v)
A
ACC – E | IG SW ACC | 10 – 14
IG – E | IG SW ON | 10 – 14
STP – E | Depress brake pedal | 10 – 14
KLS – E | (1) IG SW ACC and P position | 0
| (2) R, N, D, 2, L position | 7.5 – 11
| (3) R, N, D, 2, L position (after one second) | 6 – 9.5
B
SLS(+) – SLS(–) | (1) IG SW ON and P position | 0
| (2) Depress brake pedal | 8 – 13.5
| (3) Depress brake pedal (after 20 seconds) | 6 – 8.5
| (4) R,N,D,2,L position | 0
C
P1 – P | (1) IG SW ON, P position and depress brake pedal | 0
| (2) R,N,D,2,L position | 9 – 13.5
P2 – P | (1) IG SW ACC and P position | 9 – 13.5
| (2) R,N,D,2,L position | 0
2. INSPECT SHIFT LOCK SOLENOID
(a) Disconnect the solenoid connector.
(b) Using an ohmmeter, measure the resistance between terminals 1 and 2.
Standard resistance:
20–28
If resistance value is not as specified, replace the solenoid.
(c) Apply the battery positive voltage between terminals 1 and 2. At this time, confirm that the solenoid operates.
If the solenoid does not operated, replace the solenoid.