
EG–124
ENGINE – ENGINE MECHANICAL
ENGINE & TRANSMISSION ASSEMBLY
1. A/T:
CHECK TORQUE CONVERTER CLUTCH INSTALLATION
Using calipers and straight edge, measure from the installed
surface of the torque converter clutch to the front surface of
the transmission.
Correct distance:
Less than 0.1 mm (0.004 in.)
If the distance is not as specified, check for an improper
installation.
2. 2JZ–GE M/T:
INSTALL CLUTCH DISC AND COVER
(a) Insert SST in the clutch disc, and then set them and the cover
in position.
SST 09301–00110
Front ←
Matchmarks
SST
(b) Align the matchmarks on the clutch cover and flywheel.
(c) Tighten the bolts evenly and gradually while pushing SST.
Make several passes around the cover until it is snug.
SST 09301–00110
(d) Torque the bolts on the clutch cover in the order shown.
Torque: 19 N·m (195 kgf·cm, 14 ft·lbf)
3. ASSEMBLE ENGINE AND TRANSMISSION
(a) M/T:
Align the input spline with the clutch disc and install the trans-
mission to the engine.
(b) Align the 2 knock pins on the cylinder block with the pin holes
of the clutch housing.
(c) Install the transmission with the 6 bolts.
Torque:
14 mm head
39 N·m (400 kgf·cm, 29 ft·lbf)
17 mm head
72 N·m (730 kgf·cm, 43 ft·lbf)
M/T
(V160)
17 17
17
17 17
14
A/T
17 17
17
17 17
14
P11501
G01137 P13163
P13222
P13200
P13202
Z09525
Z09545