
ENGINE – ENGINE MECHANICAL
EG–21
(d) Using a timing light, check the ignition timing.
Ignition timing:
10 ± 2° BTDC @ idle
(Transmission in neutral position)
If the ignition timing is not as specified, check the valve timing. (See step 14 in timing belt installation)
(e) Remove the SST from the DLC1.
SST 09843–18020
5. FURTHER CHECK IGNITION TIMING
Ignition timing:
10–20° BTDC @ idle
(Transmission in neutral position)
HINT: The timing mark moves in a range between 10° and 20°.
6. DISCONNECT TACHOMETER AND TIMING LIGHT
IDLE SPEED INSPECTION
1. INITIAL CONDITIONS
(a) Engine at normal operating temperature
(b) Air cleaner installed
(c) All pipes and hoses of air induction system connected
(d) All accessories switched OFF
(e) All vacuum lines properly connected
HINT: All vacuum hoses for EGR system, etc. should be properly connected.
(f) SFI system wiring connectors fully plugged
(g) Ignition timing set correctly
(h) Transmission in neutral position
2. CONNECT TACHOMETER
(See step 2 in ignition timing inspection and adjustment (2JZ–GE))
3. INSPECT IDLE SPEED
(a) Race the engine speed at 2,500 rpm for approx. 90 seconds.
(b) Check the idle speed.
Idle speed:
2JZ–GE
700 ± 50 rpm
2JZ–GTE
650 ± 50 rpm
If the idle speed is not as specified, check the IAC valve. (See on–vehicle inspection in ISC valve in SFI System)
4. DISCONNECT TACHOMETER
PI1833