
EM-67
ENGINE MECHANICAL (2JZ-GTE) - ENGINE UNIT
P11526
(g) Temporarily install the support member to the engine rear mounting insulator with the 4 nuts.
(h) Install the 4 bolts holding the support member to the body.
Torque: 25.5 N·m (260 kgf·cm, 19 ft·lbf)
(i) Tighten the 4 nuts holding the support member to the engine rear mounting insulator.
Torque: 13 N·m (135 kgf·cm, 10 ft·lbf)
P11531
(j) Tighten the 2 nuts holding the engine front mounting insulators to the front suspension crossmember.
Torque:Torque: 59 N·m (600 kgf·cm, 43 ft·lbf)
10. M/T:
INSTALL TRANSMISSION SHIFT LEVER
Torque: 19 N·m (195 kgf·cm, 14 ft·lbf)
A/T
Neutral Position
①
②
③
P10888
Z16740
11. A/T:
CONNECT TRANSMISSION CONTROL ROD
(a) Shift the shift lever to N position.
(b) Fully turn the control shaft lever back and return 2 notches. It is now in neutral position.
(c) Connect the control rod to the shift lever with the nut.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
12. INSTALL PROPELLER SHAFT
(See page PR-1 1)
13. INSTALL REAR CENTER FLOOR CROSSMEMBER BRACE
Torque: 28 N·m (290 kgf·cm, 21 ft·lbf)
14. INSTALL EXHAUST PIPE HEAT INSULATOR
15. INSTALL NO.2 FRONT EXHAUST PIPE
Install a new gasket and the front exhaust pipe with 3 new nuts.
Torque: 62 N·m (630 kgf·cm, 46 ft·lbf)
16. INSTALL EXHAUST PIPE ASSEMBLY
(a) Install the hook of the tailpipe to the 2 rings on the tailpipe bracket.
(b) Install the hook of the exhaust pipe to the 2 rings on the exhaust pipe brackets.
(c) Install the pipe support bracket with the 2 bolts.
Torque: 43 N·m (440 kgf·cm, 32 ft·lbf)
(d) Install a new gasket and the No.2 front exhaust pipe to the front exhaust pipe with the 2 bolts and 2 new nuts.
Torque: 58 N·m (590 kgf·cm, 43 ft·lbf)
1997 SUPRA (RM502U)
Author : Date : 1172