
EG–300
ENGINE – SFI SYSTEM (2JZ–GTE)
SOLENOID RESISTOR
COMPONENTS FOR REMOVAL AND
INSTALLATION
Cover
Solenoid Resistor
Solenoid Resistor
Assembly
Bracket
Solenoid
Resistor
Connector
P11345
SOLENOID RESISTOR INSPECTION
1. DISCONNECT SOLENOID RESISTOR CONNECTOR
2. INSPECT SOLENOID RESISTOR
Using an ohmmeter, measure the resistance between terminal +B and other terminals.
Resistance:
At 20˚C (68˚F) Approx. 6 Ω
If the resistance is not as specified, replace the resistor.
3. RECONNECT SOLENOID RESISTOR CONNECTOR
#20
#10
+B
#30
Ohmmeter
#40
#50 #60
P11451