
EG–301
ENGINE – SFI SYSTEM (2JZ-GTE)
VSV FOR FUEL PRESSURE CONTROL
COMPONENTS FOR REMOVAL AND
INSTALLATION
Vacuum Sensing Hose
VSV
VSV Connector
Vacuum Sensing Hose
P11478
Ohmmeter
Continuity
P11340
Ohmmeter
No Continuity
P11341
VSV INSPECTION
1. REMOVE VSV
2. INSPECT VSV
A. Inspect VSV for open circuit
Using an ohmmeter, check that there is continuity between
the terminals.
Resistance:
At 20˚C (68˚F) 33–39 Ω
If there is no continuity, replace the VSV.
B. Inspect VSV for ground
Using an ohmmeter, check that there is no continuity be-
tween each terminal and the body.
If there is continuity, replace the VSV.