
AFTER ASSEMBLY
1. INSTALL OIL PUMP
(See oil pump installation in Lubrication System)
2. INSTALL WATER PUMP
(See water pump installation in Cooling System)
3. 2JZ–GTE:
INSTALL CRANKSHAFT POSITION SENSOR
Torque: 8.8 N·m (90 kgf·cm, 78 in.·lbf)
4. INSTALL RH ENGINE MOUNTING BRACKET AND
INSULATOR ASSEMBLY
HINT: The RH mounting bracket is marked "A ← EX".
Torque: 58 N·m (590 kgf·cm, 43 ft·lbf)
5. INSTALL ENGINE COOLANT DRAIN PLUG
Torque: 29 N·m (300 kgf·cm, 22 ft·lbf)
6. 2JZ–GTE:
INSTALL UNION FOR OIL COOLER HOSE
(a) Apply adhesive to 2 or 3 threads of the union.
Adhesive:
Part No. 08833–00070, THREE BOND 1324, or
equivalent
(b) Install the union.
Torque: 39 N·m (400 kgf·cm, 29 ft·lbf)
Adhesive
P12540
7. INSTALL KNOCK SENSORS AND OIL PRESSURE
SWITCH
(a) Apply adhesive to 2 or 3 threads of the oil pressure switch.
Adhesive:
Part No. 08833–00080, THREE BOND 1344, LOCTITE
242 or equivalent
Adhesive
P10820
(b) Using SST, install the 2 knock sensors and oil pressure
switch.
SST 09816–30010
Torque:
Knock sensor
44 N·m (450 kgf·cm, 33 ft·lbf)
Oil pressure switch
14 N·m (150 kgf·cm, 11 ft·lbf)
Oil Pressure
Switch
Knock Sensor
SST
P13197